Garage two (2) lower level construction is underway starting with the east wall. Once the east wall is completed, the west wall will start. 
Upon completion of the west wall, (April 15, 2021) the upper level of garage 2 will start. Upper level of garage two involves sealing of the entire 
deck surface. In order to do this, all vehicles will have to be removed from the lot from April 15, 2021 thru April 22, 2021. 

We THANK the residents who park in the lower level of garage two for their patience during this time!